Unit No.1 High Pressure Heater No.6, 7 and 8 Emergency Control Valve Not Fully Shut

Posted on 03:11 by Unknown
HP HTR 8 level transmitter showing very low reading. Check at local gauge glass found actual level low. Check at the emergency control valve found, High Pressure Heater No.7 and No.8 valve position not fully shut and causing the HP HTR level drain to the flash box. DCS command to the control valve already fully shut. Suspect not enough air pressure to close the control valve (air to close).

After doing some checking, not enough air pressure to close the control valve from the volume booster. The function of volume booster is to boost big volume air to the valve diaphragm either fast closing or fast opening. Servicing done for all volume booster HP Heater and reading back to normal operation.

Checking at the store found that the stock level for this volume booster is also low and need to raise new purchase request. I enclose here the photo and the specification for you to review.


Volume
Booster
B
lackborough Control Valve
Model No : 25
SWP : 150 Psig
Pipe Conns : ¼ ” NPT

Email ThisBlogThis!Share to XShare to Facebook
Posted in Turbine, Valve and Fitting | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ►  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ►  October (8)
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ►  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ►  September (6)
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ►  March (2)
    • ►  February (4)
    • ►  January (3)
  • ▼  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ▼  February (22)
      • Macbook Air World's Thinnest Notebook
      • Introduction to Coal Fired Power Plant
      • Arizona to Get Large Solar Power Plant
      • My Handphone - Nokia 2100
      • Beautiful Night Scene at Coal Fired Power Plant
      • Digital Temperature Transmitter
      • Hydroponic pH Meter Application
      • Heat Exchanger
      • Turbine Function Block Generally
      • Boiler Functional Block Generally
      • The Fancy Color of Beamex MC5 Fieldbus Calibrator
      • Portable pH Calibrator
      • Chernobyl Nuclear Power Plant Disaster
      • NEW Canon Digital Camera IXUS 960
      • Trial Instrumentation Field Device ECP Flow Switch...
      • Valentine's Day 14 February
      • Gong Xi Fa Cai and Happy Chinese New Year!
      • Endress Hauser Cerabar M PMP48
      • New Pressure Gauge to be Fitted at The Condenser I...
      • Power-Gen Asia Conference and Exhibition 21-23 Oct...
      • Blog Summary On instrumentations.blogspot.com Janu...
      • Unit No.1 High Pressure Heater No.6, 7 and 8 Emer...
    • ►  January (27)
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile