- Manjung Coal Fired 3X700 MW Power Plant on Project Description
- Electro Chlorination Plant Flow Switch Problem
- Proposal of New Waltron Sodium Analyser 9001 Series at Water Treatment Plant
- Purpose of Water Quality Analyser System in Power Plant
- Generator Stator Vibration Spikes
- Feed Water Tank Differential Pressure Gauge Unit and Range Change
- Microrec Problem
- Bunker Level Transmitter Faulty
- Washdown Water Sump Level Switch Problem
- Band Screen Guide Radar and Hydrostatic Level Transmitter
- Generator Panel Alarm on Conductivity Analyser
- Electro Chlorination Plant New Flow Switch Project
- Water Treatment Plant Acid Day Tank Magnetic Level Switch Faulty
- ABB Water Analyser New Purchasing List
- Coal Bunker Level Transmitter Problem
- Generator RTDs Converter To Purchase: Brand WIKA
- GP Joran Coal Fired Power Plant January 2008
- LP Heater 4 Normal Level Control Valve Diaphragm Leak
- Lumut Power Plant
- Steam Turbine
- Generator Hydrogen Gas Cooling System
All things that happened which I think can be put in this blog on daily work basis still continue. My blog Instrumentation and Process Control also will doing summary report on continuing monthly basis at the end or early month so that my blog readers will not miss it. Enjoy this reading!