Jimah Power Plant is own and operated by Jimah Energy Venture Sdn Bhd. The structure consist of 2X700MW coal fired power plant design. The plant located between border Negeri Sembilan and Selangor state. Sumitomo Sumi Power Consortium is the main contractor for EPC works.
The construction of the Jimah Coal Fired Power Plant has been started on July 2005 and completed on March 2008.
The construction of the Jimah Coal Fired Power Plant has been started on July 2005 and completed on March 2008.
0 comments:
Post a Comment