How a Coal-fired Power Plant works

Posted on 01:20 by Unknown
Coal Fired Power Plant Process

1. Coal Supply

  • Coal from the mine is delivered to the coal hopper, where it is crushed to five centimetres (2 inches) in size.
  • The coal is processed and delivered by a conveyor belt to the generating plant.

2. Pulverizer

  • The coal is then pulverized, or crushed, to a fine powder, mixed with air and blown into the boiler, or furnace for combustion.

3. Boiler

  • The coal / air mixture ignites instantly in the boiler.
  • Millions of litres of purified water are pumped through tubes inside the boiler.
  • Intense heat from the burning coal turns the purified water in the boiler tubes into steam, which spins the turbine (see number four) to create electricity.

4. Precipitator, stack

  • Burning coal produces carbon dioxide (CO2), sulphur dioxide (SO2) and nitrogen oxides (NOx).
  • These gases are vented from the boiler.
  • Bottom ash, which is made of coarse fragments that fall to the bottom of the boiler, is removed.
  • Fly ash, which is very light, exits the boiler along with the hot gases.
  • An electrostatic precipitator (a huge air filter) removes 99.4 per cent of fly ash before the flue gases are dispersed into the atmosphere.

5. Turbine, generator

  • Water in the boiler tubes picks up heat from the boiler and turns into steam.
  • The high-pressure steam from the boiler passes into the turbine (a massive drum with thousands of propeller blades).
  • Once the steam hits the turbine blades, it causes the turbine to spin rapidly.
  • The spinning turbine causes a shaft to turn inside the generator, creating an electric current.

6. Condensers and the cooling water system

  • Cooling water is drawn into the plant and circulated through condensers, which cools steam discharged from the turbine.
  • Steam from the turbine also passes through the condensers in separate pipes from cooling water.
  • The cold water is warmed by the steam, which condenses back into pure water and circulates back to the boiler to begin the process of generating electricity again.
  • Cooling water, now warm from the heat exchange in the condensers, is released from the plant.

7. Water treatment plant: water purification

  • To reduce corrosion, water must be purified for use in the boiler tubes.
  • Other wastewater systems within the plant collect water used to clean pipes and other equipment, and sludge from the water purification process and other processes.
  • Waste water is pumped out of the plant and into the holding ponds.

8. Precipitator, Ash systems

  • Ash that builds up on the precipitator's plates is vibrated off and collected in large hoppers or bins.
  • Fly ash and bottom ash are removed from the plants and hauled to disposal sites or ash lagoons.
  • Depending on the market demand, fly ash produced from TransAlta's three plants is sold to the cement industry for construction.

9. Substation, transformer, transmission lines

  • Once the electricity is generated, transformers increase the voltage so it can be carried across the transmission lines.
  • Once electricity is delivered to substations in cities and towns, the voltage flowing into the distribution lines is reduced, and then reduced again to distribute electricity to customers.
Source: canadiancleanpowercoalition
Email ThisBlogThis!Share to XShare to Facebook
Posted in General | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • Sheet Metal
    Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metalworking, and can be cut and be...
  • Foxboro Malaysia
    Yesterday, I posted about the Foxboro Absolute Pressure Transmitter . Then searching around the internet for their support and services in M...
  • List of Hydro Power Plant in Malaysia
    Hydropower Peninsular Malaysia Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsular with an installed generating ca...
  • CCI Sulzer Valve and Drag Control Valve
    Description: PV6 CCI Part Number: 103.215.282.001 Valve Serial Number: Valve Control Description: Seal Set PV6 CCI Part Number: 000.101.000....
  • SJ Gelugor Power Station
    Stesen Janakuasa Gelugor is owned by TNB. 
  • Process pressure: Level and pressure measurements
    Measuring principle The pressure measuring cell converting the pressure into a signal which can be evaluated electrically is the heart of ...
  • New Pressure Gauge to Purchase
    Item : Pressure Gauge Manufacturer : Chem Resist Dial gauge : 4” Connection : ½” NPT Type : Direct bottom Range : 0-11 bar/160 psi Complete ...
  • Sultan Iskandar Power Station
    Sultan Iskandar Power Station or Pasir Gudang  Power Station is located at Pasir Gudang  Johor.  Type of Plant Thermal (2 ST), combined cycl...
  • Blog Summary On The instrumentations.blogspot.com 30th March 2008
    I am posting early this entry because next week I will be away from my power station due to some matters. Meaning that there will no post ...
  • Lasko 20" Cyclone Fan 3520
    Are this suitable to put at plant for machine cooling purpose? Cyclone fan. After surf internet, I found this: The Lasko 20" Cyclone ...

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ►  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ►  October (8)
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ▼  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ▼  September (6)
      • Hydroelectricity Dam or Hydroelectricity Power Sta...
      • How a Coal-fired Power Plant works
      • General Coal Fired Power Plant View
      • Field Xpert SFX100 Is the Process Industry’s First...
      • Is the Nokia 5800 XpressMusic the best handset Nok...
      • 21 Reasons Why Nokia 5800 is better than Apple Iph...
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ►  March (2)
    • ►  February (4)
    • ►  January (3)
  • ►  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ►  February (22)
    • ►  January (27)
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile