Manjung Coal Fired 3X700MW Power Plant

Posted on 07:01 by Unknown
Manjung Coal Fired 3X700MW Power Plant

Project Description :

The Manjung Power Plant, a three-unit, 2100-Megawatt coal-fired power station. Each 700-Megawatt unit consists of a steam generating boiler, high pressure steam turbine with condenser, a generator, other equipment for electrical supplies, and plant controls which incorporate a high degree of automation and safety protection.

The Manjung Plant also features the first triple-flue stack built in the country and also the highest stack in Malaysia at 197 metres. Other key features of this plant include:

· Use of sub-bituminous and bituminous coals with low sulphur grades.

· State-of-the art Pulverised Fuel Firing combustion technology

· Boilers equipped with low-NOx burners.

· Electrostatic Precipitators (ESPs) that can achieve up to 99.9% dust removal.

· A wet-type seawater scrubber Flue Gas Desulphurisation (FGD) system is installed to ensure SOx emissions are within international limits.

· An ash pond around which the Bentonite Cut-off Wall technique is used to contain leachates and prevent any contaminated water from leaking into the surrounding aquatic environment.

The civil construction requirements of the Manjung Power Plant project include 250,000 cubic metres of concrete, 25,000 tonnes of steel reinforcement, a 1.5 kilometre-long offshore cooling intake, a 100-metre long offshore outfall, and 30,000 tonnes of structural steel.

This article take from www.pecd.com.my.

Email ThisBlogThis!Share to XShare to Facebook
Posted in General, Power Plant | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ►  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ►  October (8)
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ►  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ►  September (6)
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ►  March (2)
    • ►  February (4)
    • ►  January (3)
  • ▼  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ►  February (22)
    • ▼  January (27)
      • Introduction to Generator Hydrogen Gas Cooling System
      • What is A Steam Turbine?
      • Lumut or Segari Power Plant
      • Unit No.1 LP Heater No.4 Normal Level Control Valv...
      • GP Joran Coal Fired Power Plant 2008 Among Staff U...
      • GP Joran Coal Fired Power Plant 2008
      • Band Screen Vega Radar Level Transmitter Trending
      • Conductivity Analyser High Alarm Operated at The G...
      • Change New Type Bandscreen Level Transmitter
      • Wet Coal Cause Bunker Level Transmitter Fluctuate
      • ECP Flow Switch Already Delivered Today
      • WTP ACID DAY TANK LEVEL MAGNETIC SWITCH FAULTY
      • Microrec Alarm Came Back
      • Washdown Water Sump Level Switch
      • New Project Flow Switch at Electrochlorination Plant
      • ABB Water Analyser Urgently Required
      • Bunker Level Transmitter Faulty
      • Fault Alarm at Microrec Appeared
      • Feed Water Tank Pressure Transmitter Bar Absolute
      • RTDs Converter
      • Unit No.3 Generator Stator Terminal Connection RTDs
      • Water Analyser QUZ Cabin
      • Waltron Sodium Analyser 9001 Series
      • Electrochlorination Plant (ECP) Flow Switch
      • Combustion Air Flow
      • How to Reboot Microrec
      • Manjung Coal Fired 3X700MW Power Plant
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile