Monday, 14 January 2008

Fault Alarm at Microrec Appeared

Posted on 23:05 by Unknown

Turbine Protection Alarm activated last night. After the checking, here we found that;

- Protection Fault 01MAY10EU249XC8

- Calculated Trip Test Fault 01MAY10EU276XC9

- Protection Test Fault 01MAY10EU281XC9

At microrec, a lot of logics need becarefully check since the software history itself given much trouble to unit.

Discussed in detail among us this morning examining the risks in re-setting this alarm and the conclusion reached is minimal risk, to be extra careful should be carried out at low loads and after evening peak.

More detail: the protection listed above has a self checking routine usually every 12/24 hours, this sequence has hung up on detection of some parameter not giving expected results and requires re-setting. If not re-set valve freedom tests cannot be carried out. It is expected that the fault will re-appear within 12/24 hours ideally the fault should be re-set just before valve freedom tests. Clearing the defect requires detailed investigation with the unit off load.

Here is some short cut step when we clearing the alarm (Many steps are not reveal here);

1) BO4Y010P CON#302 f0r to '0'

2) PO4GNTRT #Safeties_Set force to '0' then unforce back the logic.

3) BO4Y31SE SEQ12*700 from state '11' back to '0'.

Work done.

Email ThisBlogThis!Share to XShare to Facebook
Posted in Microrec | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • CCI Sulzer Valve and Drag Control Valve
    Description: PV6 CCI Part Number: 103.215.282.001 Valve Serial Number: Valve Control Description: Seal Set PV6 CCI Part Number: 000.101.000....
  • List of Hydro Power Plant in Malaysia
    Hydropower Peninsular Malaysia Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsular with an installed generating ca...
  • Foxboro Malaysia
    Yesterday, I posted about the Foxboro Absolute Pressure Transmitter . Then searching around the internet for their support and services in M...
  • Sheet Metal
    Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metalworking, and can be cut and be...
  • SJ Gelugor Power Station
    Stesen Janakuasa Gelugor is owned by TNB. 
  • Hydroelectric in Malaysia
    Terengganu Hydroelectric Dam 400MW installed capacity Sultan Mahmud Power Station 4X100MW Cameron Highlands Dam 262MW installed capacity Jo...
  • Lumut or Segari Power Plant Photo
    Lumut or Segari Power Plant Perak View at Night Aerial view of Segari Power Plant and GB3 Combined Cycle Power Plant My last articles about ...
  • Langkawi Power Plant Teluk Ewa, Langkawi Kedah
    Langkawi Power Plant Teluk Ewa, Langkawi Kedah Langkawi Power Plant Teluk Ewa, Langkawi Kedah
  • Hydroelectricity Explained
    Hydroelectricity Itaipu Brazil/Paraguay Dam scene at night Close up view of dam: Itaipu Brazil/Paraguay Hydroelectricity dam Hydroelectric...
  • Sultan Iskandar Power Station
    Sultan Iskandar Power Station or Pasir Gudang  Power Station is located at Pasir Gudang  Johor.  Type of Plant Thermal (2 ST), combined cycl...

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ►  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ►  October (8)
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ►  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ►  September (6)
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ►  March (2)
    • ►  February (4)
    • ►  January (3)
  • ▼  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ►  February (22)
    • ▼  January (27)
      • Introduction to Generator Hydrogen Gas Cooling System
      • What is A Steam Turbine?
      • Lumut or Segari Power Plant
      • Unit No.1 LP Heater No.4 Normal Level Control Valv...
      • GP Joran Coal Fired Power Plant 2008 Among Staff U...
      • GP Joran Coal Fired Power Plant 2008
      • Band Screen Vega Radar Level Transmitter Trending
      • Conductivity Analyser High Alarm Operated at The G...
      • Change New Type Bandscreen Level Transmitter
      • Wet Coal Cause Bunker Level Transmitter Fluctuate
      • ECP Flow Switch Already Delivered Today
      • WTP ACID DAY TANK LEVEL MAGNETIC SWITCH FAULTY
      • Microrec Alarm Came Back
      • Washdown Water Sump Level Switch
      • New Project Flow Switch at Electrochlorination Plant
      • ABB Water Analyser Urgently Required
      • Bunker Level Transmitter Faulty
      • Fault Alarm at Microrec Appeared
      • Feed Water Tank Pressure Transmitter Bar Absolute
      • RTDs Converter
      • Unit No.3 Generator Stator Terminal Connection RTDs
      • Water Analyser QUZ Cabin
      • Waltron Sodium Analyser 9001 Series
      • Electrochlorination Plant (ECP) Flow Switch
      • Combustion Air Flow
      • How to Reboot Microrec
      • Manjung Coal Fired 3X700MW Power Plant
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile