Sultan Mahmud Power Station or Kenyir Dam (Malay: Empangan Kenyir) is the hydroelectric dam which forms Kenyir Lake, Terengganu, Malaysia. It is located 50 km southwest of Kuala Terengganu on the Kenyir River. The project is a multipurpose hydroelectric power and flood mitigation scheme.
Sunday, 30 December 2012
Kenyir Hydroelectric
Posted on 15:05 by Unknown
Sultan Mahmud Power Station or Kenyir Dam (Malay: Empangan Kenyir) is the hydroelectric dam which forms Kenyir Lake, Terengganu, Malaysia. It is located 50 km southwest of Kuala Terengganu on the Kenyir River. The project is a multipurpose hydroelectric power and flood mitigation scheme.
Monday, 3 December 2012
Continental CC5 just RM180/tire
Posted on 17:31 by Unknown
Last Saturday, I went to Klang and find the Kedai Papan, the cheapest tire shop maybe in KL. Replaced my 4 old tires which cost me RM720.00. The others tire shop quote me at RM215/tire. Woowww.... so much gap from the Kedai Papan.
If you are from the shah alam - tol shapadu - go straight through Batu Belah until you arrive at traffic light and then turn left going to Klang town. Just go straight and will go thru some traffic light. The Kedai Papan is just opposite shell.
Friday, 30 November 2012
Samsung Galaxy Y at RM400/=
Posted on 17:19 by Unknown
Last week I bought Samsung Galaxy young at Tesco Manjung. The specs as below:
- Powerful & Compact
- Rich Smart Experience
- 5 coloured back covers in-box
- Battery 1200mA
- Camera 2 Megapixels
- 97.5 gram weight
- 8G memory card
- Smart case with pocket
Tuesday, 30 October 2012
GEA Heat Exchangers / GEA PHE Systems / Global
Posted on 16:35 by Unknown
Welded plate heat exchanger
Fully welded - but adaptable at any time
GEABloc combines two different plate corrugations in an innovative way. The plates are rotated through 90° to one another and then welded together to produce two different cross-flow channels. The frame is made of four pillars, a bottom plate and a top plate together with four side pressure plates, and connections mounted in the pressure plates. All frame components are bolted together for easily dismantling to clean and maintain the plate pack.
GEABloc is available in various corrugation designs and sizes for a wide range of applications. Adjustable deflectors allow the heat exchanger to be adapted to its operating points delivering these features:
Max. operating temperature 315° C, on both sides
Max. operating pressure 32 bars, on both sides
Material 1.4404, SMO, Titanium, etc.
Surface area 1–320m²
Connection diameter DN50–DN400
Max. flow rate 3,860m³/h
Corrugation patterns: Herring-bone, Dimple
This PHE is generally used in the oil and gas industry, in petrochemical and chemical applications, in the automobile and pharmaceuticals industry, as well as in paper manufacturing.
Fully welded plate heat exchanger
Wednesday, 24 October 2012
How much it cost to change Toyota Vios oil engine?
Posted on 17:01 by Unknown
How much it cost to change your Toyota Vios Motor Engine Oil? Normally it will cost more than RM170 and it included car wash and minor inspection. The major parts for this minor maintenance just oil filter, semi synthetics 10-40 Toyota Motor Engine Oil and gasket.
Me? Just send to service workshop. The cost of the maintenance quite cheap and will not exceed RM100. Agreed that there is pro and cons when you send your auto to non service provider.
Monday, 22 October 2012
Samsung Series 5 Ultra Core i5
Posted on 09:35 by Unknown
Ultrabook is a extremely thin laptop and you will learn more with this video.
Friday, 19 October 2012
Manjung 4 - 1x1000MW Coal Fired Power Plant
Posted on 19:47 by Unknown
Manjung 4 - 1x1000MW Coal Fired Power Plant the ultra-super critical is in progress which will be completed by 2015.
TNB Janamanjung Sdn Bhd, a wholly owned subsidiary of Tenaga Nasional Bhd expects to increase revenue to RM4 billion a year from now when the RM3 billion coal fired power plant Manjung Power Station 4 in the Sultan Azlan Shah (SJSAS), Lumut, Perak operation in 2015.
Chief Operating Officer and General Manager, Shamsul Ahmad, said the forecast was based on the capacity of projects worth RM5.8 billion, which is able to produce an additional 1,000 megawatts (MW) of electricity a day.
TNB Janamanjung Sdn Bhd, a wholly owned subsidiary of Tenaga Nasional Bhd expects to increase revenue to RM4 billion a year from now when the RM3 billion coal fired power plant Manjung Power Station 4 in the Sultan Azlan Shah (SJSAS), Lumut, Perak operation in 2015.
Chief Operating Officer and General Manager, Shamsul Ahmad, said the forecast was based on the capacity of projects worth RM5.8 billion, which is able to produce an additional 1,000 megawatts (MW) of electricity a day.
Subscribe to:
Posts (Atom)




