Rationale for this Workshop


80% of the world's rig-building market is concentrated in Singapore. Consequently, shipyards in Singapore designs and builds 60% of the rowld's jack-up oil rigs.

  • Destruction or damages done to offshore oil rigs due to sucessive hurricanes
  • Many of the current oil rigs had reached their life expectancy and required replacing
  • Recent BP oil spill - many exploration companies rush to replace their old rigs with new ones so as to meet the stricter regulations and rules governing the construction of oil rigs.

However, many of these new-build oil rig projects are delayed due to the commissioning process. Such delays are a threat to the profits of the project and often involve conflicts between the main stakeholders of the project such as:


  • The yard/factory/workshop representing the services company/vendor
  • The construction team of engineers
  • The commissioning team of engineers
  • The operations team and the coming crew of the unit or ship

Reason for Attending


  • Equips delegates with the knowledge to understand and implement efficiently the mechanical completion, commissioning and conflict resolution activities of oil rig units
  • Provide attendees with a more strategic approach to commissioning, along with numerous tools to use throughout the commissioning process
  • Through the workshop, each delegate will improve job performance by attaining
  • Better alignment of mechanical completion & commissioning process steps with stakeholder’sneeds
  • Better commissioning procedures
  • Better mechanical completion
  • Fewer disputes and claims
  • Better project outcomes
  • Essential for all involved parties to understand the entire process, keys to success and what is required of their own roles
  • All materials and exercises are particularly specific to the oil rig industry in Asia to be more relevant to the needs of the delegates
  • Content is developed from both a rig owner’s and shipbuilder’s point of view.
  • Round table discussions are also included so that delegates are actively invited to share their view


Email ThisBlogThis!Share to XShare to Facebook
Posted in Events | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • CCI Sulzer Valve and Drag Control Valve
    Description: PV6 CCI Part Number: 103.215.282.001 Valve Serial Number: Valve Control Description: Seal Set PV6 CCI Part Number: 000.101.000....
  • List of Hydro Power Plant in Malaysia
    Hydropower Peninsular Malaysia Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsular with an installed generating ca...
  • Foxboro Malaysia
    Yesterday, I posted about the Foxboro Absolute Pressure Transmitter . Then searching around the internet for their support and services in M...
  • Sheet Metal
    Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metalworking, and can be cut and be...
  • SJ Gelugor Power Station
    Stesen Janakuasa Gelugor is owned by TNB. 
  • Hydroelectric in Malaysia
    Terengganu Hydroelectric Dam 400MW installed capacity Sultan Mahmud Power Station 4X100MW Cameron Highlands Dam 262MW installed capacity Jo...
  • Lumut or Segari Power Plant Photo
    Lumut or Segari Power Plant Perak View at Night Aerial view of Segari Power Plant and GB3 Combined Cycle Power Plant My last articles about ...
  • Langkawi Power Plant Teluk Ewa, Langkawi Kedah
    Langkawi Power Plant Teluk Ewa, Langkawi Kedah Langkawi Power Plant Teluk Ewa, Langkawi Kedah
  • Hydroelectricity Explained
    Hydroelectricity Itaipu Brazil/Paraguay Dam scene at night Close up view of dam: Itaipu Brazil/Paraguay Hydroelectricity dam Hydroelectric...
  • Sultan Iskandar Power Station
    Sultan Iskandar Power Station or Pasir Gudang  Power Station is located at Pasir Gudang  Johor.  Type of Plant Thermal (2 ST), combined cycl...

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ▼  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ▼  October (8)
      • Plate Heat Exchanger Cleaning
      • Incoterms 2010 (NEW RULES)
      • Offshore Oil Rigs Mechanical Completion & Commissi...
      • Hulu Terengganu Hydroelectric Project
      • Depth Micrometer
      • Jimah Power Plant
      • Raytek ST20XB Non-Contact Handheld Infrared Thermo...
      • Shell and tube heat exchanger design
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ►  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ►  September (6)
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ►  March (2)
    • ►  February (4)
    • ►  January (3)
  • ►  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ►  February (22)
    • ►  January (27)
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile