Perlis Power CCGT Plant

Posted on 08:04 by Unknown
Perlis Power CCGT Plant

Perlis Power CCGT Plant II

Perlis Power CCGT Plant Under Contruction

More data Perlis Power CCGT Plant are as below:
  • Mechanical and Electrical Erection Works for a 675MW 3X KA 13E2 Perlis Combined Cycle Power Plant.

  • Mechanical and Electrical Erection Works for 675MW 3X KA 13E2 Gas Turbines, Steam Turbine, Balance of Plant and Piping for Perlis Combined Cycle Power Plant.
  • Construction started in Feb 2002 and ended in Nov 2002.
  • Client: Alstom Power Asia Pacific Sdn Bhd
  • Peak manpower: 800
Email ThisBlogThis!Share to XShare to Facebook
Posted in Power Plant | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • CCI Sulzer Valve and Drag Control Valve
    Description: PV6 CCI Part Number: 103.215.282.001 Valve Serial Number: Valve Control Description: Seal Set PV6 CCI Part Number: 000.101.000....
  • List of Hydro Power Plant in Malaysia
    Hydropower Peninsular Malaysia Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsular with an installed generating ca...
  • Foxboro Malaysia
    Yesterday, I posted about the Foxboro Absolute Pressure Transmitter . Then searching around the internet for their support and services in M...
  • Sheet Metal
    Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metalworking, and can be cut and be...
  • SJ Gelugor Power Station
    Stesen Janakuasa Gelugor is owned by TNB. 
  • Hydroelectric in Malaysia
    Terengganu Hydroelectric Dam 400MW installed capacity Sultan Mahmud Power Station 4X100MW Cameron Highlands Dam 262MW installed capacity Jo...
  • Lumut or Segari Power Plant Photo
    Lumut or Segari Power Plant Perak View at Night Aerial view of Segari Power Plant and GB3 Combined Cycle Power Plant My last articles about ...
  • Langkawi Power Plant Teluk Ewa, Langkawi Kedah
    Langkawi Power Plant Teluk Ewa, Langkawi Kedah Langkawi Power Plant Teluk Ewa, Langkawi Kedah
  • Hydroelectricity Explained
    Hydroelectricity Itaipu Brazil/Paraguay Dam scene at night Close up view of dam: Itaipu Brazil/Paraguay Hydroelectricity dam Hydroelectric...
  • Sultan Iskandar Power Station
    Sultan Iskandar Power Station or Pasir Gudang  Power Station is located at Pasir Gudang  Johor.  Type of Plant Thermal (2 ST), combined cycl...

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ►  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ►  October (8)
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ▼  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ►  September (6)
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ▼  March (2)
      • Perlis Power CCGT Plant
      • Asia's Biggest Oil & Gas Show - OGA 2009 On-line R...
    • ►  February (4)
    • ►  January (3)
  • ►  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ►  February (22)
    • ►  January (27)
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile