Tank Farm Automation with Tankvision : Endress Hauser

Posted on 05:26 by Unknown
Endress Hauser Tank Gauging System
The Tankvision platform offers this freedom and flexibility. Tankvision uses the open and safe environment of a customer's Intranet to make Tank inventory data available to everybody who needs this info within a company. No limitations on operating software used, location or systems that are being used for optimizing logistics. It's all in the box: data gathering, tank volume calculation according to OIML and API, alarming, reporting and visualization. Both for custody transfer or "simple” inventory monitoring applications of tanks.

More details please visit Endress Hauser Malaysia website.
Read More
Posted in DCS | No comments

Thursday, 8 January 2009

Coal fired power plant disaster in USA causes jitter among Sabahans

Posted on 20:20 by Unknown

SANDAKAN: A mishap at an American coal fired power plant is causing jitters among the people in this Sabah coast district where a similar facility has been proposed.

The collapse of storage pond wall at the Kingston coal fired plant in the Tennessee has left people here wondering if they would one day face such an environmental disaster.

Elopura state asemblyman Au Kam Wah said various news reports stated that about 5.4mil cubic metres of wet coal ash enough to deluge an area of 1,200ha had spilt after the collapse of the storage pond wall at the coal fired plant on Dec 22 last year.

“If a situation like this can happen in the US, is it not inconceivable that we would face similar consequences one day,” Au said early last week.

Au said the state government should seriously reconsider the proposal to build the coal fired power plant in Sandakan amidst the growing health concerns.

“We have to take into consideration the safety and health of the people and that of the future generations, the negative impact on the environment before making a decision to implement the project in Sandakan,” he added.

Au called on the State Government to look into other alternative means of power generation, adding that a coal fired plant was not an appropriate choice as shown by the latest disaster in the US.


The Star 5th January 2009.
Read More
Posted in General | No comments

Wednesday, 7 January 2009

Jimah Coal Fired 1400MW Power Plant Port Dickson Malaysia

Posted on 04:49 by Unknown
View of Jimah 1400MW Coal Fired Power Plant

Jimah 1400MW Coal Fired Power Plant Map

These some photos that I took from other websites just to share. General facts about this power plant are as below:

Jimah 1400MW Coal Fired Power Plant will supply electricity to TNB through the Power Purchase Agreement (PPA) for duration of 25 years. The 1st unit for commercial operation date already started 1st January 2009 and 2nd unit will be on 1st July 2009.

The Jimah Power Plant located in Mukim Jimah, Daerah Port Dickson Negeri Sembilan Malaysia which expected will contribute 1400MW nett from 2 units to the Grid System. More details and some photos can be access or available at this website: http://jimah-ev.com/

Read More
Posted in Power Plant | No comments
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Popular Posts

  • CCI Sulzer Valve and Drag Control Valve
    Description: PV6 CCI Part Number: 103.215.282.001 Valve Serial Number: Valve Control Description: Seal Set PV6 CCI Part Number: 000.101.000....
  • List of Hydro Power Plant in Malaysia
    Hydropower Peninsular Malaysia Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsular with an installed generating ca...
  • Foxboro Malaysia
    Yesterday, I posted about the Foxboro Absolute Pressure Transmitter . Then searching around the internet for their support and services in M...
  • Sheet Metal
    Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metalworking, and can be cut and be...
  • SJ Gelugor Power Station
    Stesen Janakuasa Gelugor is owned by TNB. 
  • Hydroelectric in Malaysia
    Terengganu Hydroelectric Dam 400MW installed capacity Sultan Mahmud Power Station 4X100MW Cameron Highlands Dam 262MW installed capacity Jo...
  • Lumut or Segari Power Plant Photo
    Lumut or Segari Power Plant Perak View at Night Aerial view of Segari Power Plant and GB3 Combined Cycle Power Plant My last articles about ...
  • Langkawi Power Plant Teluk Ewa, Langkawi Kedah
    Langkawi Power Plant Teluk Ewa, Langkawi Kedah Langkawi Power Plant Teluk Ewa, Langkawi Kedah
  • Hydroelectricity Explained
    Hydroelectricity Itaipu Brazil/Paraguay Dam scene at night Close up view of dam: Itaipu Brazil/Paraguay Hydroelectricity dam Hydroelectric...
  • Sultan Iskandar Power Station
    Sultan Iskandar Power Station or Pasir Gudang  Power Station is located at Pasir Gudang  Johor.  Type of Plant Thermal (2 ST), combined cycl...

Categories

  • Analyser
  • Bently Nevada
  • Boiler
  • Car
  • Card
  • Coal and Ash
  • DCS
  • Electrical
  • Electro Chlorination Plant
  • Equipment
  • Events
  • Gauge
  • General
  • Generator
  • Heat Exchanger
  • Hydraulic
  • Hydroelectricity
  • Hydrolectricity
  • IT
  • Microrec
  • Mill
  • Miscellaneous
  • Motor
  • Package Equipment
  • PLC
  • Power Plant
  • Pump
  • Pump House
  • Samsung
  • Solar Energy
  • Summary Report
  • Switch
  • System
  • Terminal Block
  • Test Equipment
  • Testing and Commissioning
  • Tools
  • Toyota
  • Transducer
  • Transmitter
  • Turbine
  • Valve and Fitting
  • Water Treatment Plant

Blog Archive

  • ►  2014 (1)
    • ►  January (1)
  • ►  2013 (41)
    • ►  December (9)
    • ►  November (20)
    • ►  September (2)
    • ►  July (1)
    • ►  June (2)
    • ►  May (2)
    • ►  April (1)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (39)
    • ►  December (2)
    • ►  November (1)
    • ►  October (9)
    • ►  September (1)
    • ►  July (1)
    • ►  June (3)
    • ►  April (5)
    • ►  March (9)
    • ►  February (5)
    • ►  January (3)
  • ►  2011 (82)
    • ►  December (2)
    • ►  November (2)
    • ►  October (4)
    • ►  September (1)
    • ►  August (7)
    • ►  July (11)
    • ►  June (12)
    • ►  May (6)
    • ►  April (13)
    • ►  March (14)
    • ►  February (7)
    • ►  January (3)
  • ►  2010 (66)
    • ►  December (16)
    • ►  November (17)
    • ►  October (8)
    • ►  September (19)
    • ►  August (2)
    • ►  July (1)
    • ►  May (1)
    • ►  February (2)
  • ▼  2009 (33)
    • ►  November (6)
    • ►  October (7)
    • ►  September (6)
    • ►  August (1)
    • ►  June (3)
    • ►  May (1)
    • ►  March (2)
    • ►  February (4)
    • ▼  January (3)
      • Tank Farm Automation with Tankvision : Endress Hauser
      • Coal fired power plant disaster in USA causes jitt...
      • Jimah Coal Fired 1400MW Power Plant Port Dickson M...
  • ►  2008 (182)
    • ►  December (1)
    • ►  November (2)
    • ►  October (7)
    • ►  September (11)
    • ►  August (26)
    • ►  July (6)
    • ►  June (7)
    • ►  May (9)
    • ►  April (21)
    • ►  March (43)
    • ►  February (22)
    • ►  January (27)
  • ►  2007 (2)
    • ►  December (1)
    • ►  November (1)
Powered by Blogger.

About Me

Unknown
View my complete profile